Skip to main content
Advanced Cooling Solutions
View Climate Rentals

Tel: 0207 241 5156

24Hr: 07976 329294

info@advancedcooling.co.uk

  • Chiller Servicing
    • Chiller Engineering
    • Contracted Chiller Maintenance
    • Turbocor Chiller Servicing
    • Air Conditioning Servicing
    • Servicing and F Gas Regulations
    • Chiller Efficiency Servicing
  • Chiller Repair
    • Chiller Repair
    • Air Conditioning Repair for all AC Systems
  • Project Management
    • Emergency Cooling and Contingency Planning
    • System Design & Installation
    • Consultancy & Reporting
  • Industries
    • Food and Beverage
    • Pharmaceutical
    • Data Centres and Server Rooms
    • Steel Industry
    • Temporary Structures
    • Petro-Chemical
    • Warehouses
    • Ice Making and Ice Rink
  • Health & Safety
    • F Gas Regulations
  • Contact Us
Home / Advanced Cooling Solutions / Case Studies

Case Studies

Please find below links to temporary cooling case studies for some of the projects we have worked on:

  • A 1 megawatt chiller was installed to provide emergency process cooling for the WH Smith Halo plastic injection moulding factory.
  • Two very reliable Trane RTAB water chillers installed to meet the complete cooling needs of government offices.
  • ACS were contrated by Nussli Switzerland to supply a complete on-hire HVAC system to the temporary basket training structures built on the Lee Valley park.
  • A complete 400kw climate control system designed and installed at short notice for Olympic ceremonies performers on the Eton Manor site.
  • A Full HVAC system was installed serving a temporary staff breakout area built for the games
  • ACS were contrated by Nussli Switzerland to supply a cooling system to the athletes tunnel connecting the training and main auditorium areas.

Make an Enquiry

Recent News

  • ACR Introduces Its New Low temperature Air Handling units 20th January 2017
  • Flower Cold Storage- ACR Installs a Temporary Chilled Storage System 5th March 2016
  • ACS contracted to to maintain McQuay PEH centrifugal chiller plant 30th April 2013
safe-contractor

Our Location

Codham Hall,
Codham Hall Lane,
Brentwood,
Essex.
CM13 3JT

Latest News

  • ACS contracted to to maintain McQuay PEH centrifugal chiller plant

Customer Resources

  • Gallery
  • Case Studies

About Us

In business since 2003, Advanced Cooling Solutions have successfully offered our clients chiller and air conditioning services.

Unbeatable pricing with 24/7 engineering support.

Tel: 0207 241 5156

24Hr: 07976 329294

info@advancedcooling.co.uk

© 2022 Advanced Cooling Solutions Ltd.

Website by 10°.

Talk to Us

Please send us an instant message, we may not always be able to respond instantly so for urgent enquiries please call or email directly
(Mon-Sun, 10am-10pm)


Telephone: 07976 329 294

Email: [email protected]


  • This field is for validation purposes and should be left unchanged.