Office Building Chiller Hire in London- A Long Term Solution

Climate Rentals were approached by a customer that was experiencing problems with the chiller at their central London offices.

Office Building Chiller Hire In London- The Challenge

The client was occupying an older 30,000sq/ft building on a short four year lease- after which the site was due for re-development.

Unfortunately, the buildings chiller was found in poor condition with a number of issues which were un-economical to repair, including, burnt out compressors, broken controls and un-serviceable R22 refrigerant charge.

Previously, the client had spent considerable sums of money to keep the machine operational, but found itself in the position of having a machine that was ultimately uneconomical to repair.

Moreover, the short lease also meant that the client didn’t want to commit large amounts of capital to replace the machine. Hence, office building chiller hire in London was a service he was keen to investigate.

This 300kw chiller was installed in the adjacent car park. Temporary hose and cabling connected it to the roof plant

The 3″ hose running down the building from the roof. this connects the chiller to the roof chilled water pipe-work/ pumps

The Solution

Climate Rentals proposed a water chiller on a fixed term agreement. Set monthly costs, including all equipment, servicing and any breakdown/ repair’s appealed to the client following the open ended costs for the redundant machine.

A reliable, efficient Daikin 300kw chiller was installed with reinforced rubber hosing to connect to the buildings existing flow and return chilled water pipe-work. It was decided to install the chiller at ground level to reduce installation costs- a crane lift would have required a road closure.

Full integration was made to the buildings BMS system for auto control. The system was installed and commissioned in 1 day and has been in reliable operation for 4 years.

The Diakin chiller was located in the car park and the chilled water hosing and cabling run up the side of the building to the roof where it was connected to the buildings chilled water system. The system was manually filled and pressurised before bringing on-line to the building to prevent disruption.

3″ 10Bar reinforced rubber hosing system with Camlock connectors was specified; this sort of system is quick to install and very durable.

The 6 Key Advantages Of Office Building Chiller Hire In London

  1. No up front capital required
  2. Fast, hassle free installation of office building chiller hire in London
  3. No expensive design and consultancy fee’s
  4. Fixed costs you can budget for.
  5. Chiller hire includes all maintenance and repair costs included.
  6. Reduced energy costs from modern efficient equipment.

Summary

Major mechanical problems or older obsolete units can present major financial costs to companies. Repairs and refurbishments can be very costly, raising the question “is it a good investment to make in potentially unreliable and inefficient equipment?”

Chiller leasing can provide a practical solution to these problems.

Products Used In This Case Study

300kw Chiller Hire
300kw Chiller Hire

300kw water chiller hire made easy…..

View Product
Chilled Water Hose Hire
Chilled Water Hose Hire

Temporary chilled water hose and ancillaries rental from Advanced Climate Rentals.

View Product

How We've Helped Others In Your Sector

Temporary Ventilation Hire in London for a Production Warehouse
Temporary Ventilation Hire in London for a Production Warehouse

This was one of those jobs that landed very quickly from a client with a number of requirements. As well as experiencing very high temperatures in the production area,

View Industry
Temporary Swimming Pool Ventilation Hire at Basingstoke Aquadrome
Temporary Swimming Pool Ventilation Hire at Basingstoke Aquadrome

Basingstoke Aquadrome required a ventilation system to maintain operation whilst their fixed AHU was replaced.

View Industry
Heat Pump Ventilation Hire for Ambulance Triage Centre at New Cross Hospital
Heat Pump Ventilation Hire for Ambulance Triage Centre at New Cross Hospital

To provide temporary heat pump ventilation hire to a new ambulance triage centre whilst they awaited their new AHU. The AHU would be required to maintain the internal air temperature as well as ventilate the area.

View Industry
Chiller Hire for Hospital- Critical Cooling for a Pathology Building
Chiller Hire for Hospital- Critical Cooling for a Pathology Building

When this Trust needed chiller hire for hospital buildings they turned to ACR for a fast effective solution.

View Industry
Swimming Pool Heating Hire
Swimming Pool Heating Hire

An air handling system is critical to maintaining the correct humidity and temperature in swimming pools. Problems can arise when the temperature drops and condensation forms.

View Industry