Industrial chiller hire in Kent- This contingency plan relieved pressure over the summer months- keeping production at full capacity..
Industrial chiller hire in Kent- This contingency plan relieved pressure over the summer months- keeping production at full capacity..
To supply industrial chiller hire in Kent consisting of a 1.1mw temporary chiller system acting as a contingency backup to the clients ammonia systems.
Fitted to a central district cooling system, the clients cooling system required a back-up to serve various office and industrial processes. The total specified cooling capacity was 1100kw’s.
Dual separate chillers and pump sets required a change over system in the event of any one failing.
This manifold was fitted with isolation valves to allow the client to changeover between pump sets. 6" composite hose was used for connection, with a stainless manifold, then splitting into 2x 4" hoses to feed the chillers.
Flow from the chillers connected to the clients system. in 4″ pipe-work- one from each of the two chillers. The manifold was bespoke manufactured for the project.
ACR recommended two 550kw air cooled Trane chillers each fed with a 4″ rubber suction/discharge hose.
Connection from the pump outlets were in 6″ composite hose to a 6″ manifold with isolation valves to each branch. In this way, switching between the pumps was possible depending on which was running.
A common return manifold was supplied and fitted.
Of particular concern was the system running pressure of 5.5barg. With no heat exchanger fitted, any potential failure of the temporary hosing would result in flood back from the very large system. To mitigate this risk, all Camloc connections were specified in Stainless Steel with new hoses specifically assembled for the rating by our friends at Merseyflex.
Electrical connection was made locally using H07 RNF flexible cable supplied and fitted by ACR.
The temporary pipework was manually filled and pressure tested before opening to the clients system. Proving integrity before full operation.
Once all pre-commissioning tests were completed the system was started and the chillers load tested at 100% operation.
Finally, running logs and Fgas leak testing were completed before handing over to the client for day to day operation as required.
A really nice job this one for an appreciative client. The system was stationed as a contingency back-up for 12 weeks at the height of summer, giving the client peace of mind in the event of failure.
In the long run, contingency chiller hire can be very cost effective solution as apposed to an emergency response situation with associated down time.
If you think that your systems may be vulnerable please drop us a line. We can assist with contingency planning. Contact Here
A Carrier 30GX 750kw chiller hire installed in another area of the site. 4" hose was again used here to connect to the clients chilled water system.