Climent Rental
Case Studies

Industrial Chiller Hire in Kent for Pharmaceutical Production

INDUSTRIAL CHILLER HIRE IN KENT FOR PHARMACEUTICAL PRODUCTION

Industrial chiller hire in Kent- This contingency plan relieved pressure over the summer months- keeping production at full capacity..

client one icon

CLIENT

A Major Pharmaceutical Producer in Kent

client two icon

INDUSTRY

Pharmaceutical Production and developement

client three icon

SOLUTIONS

Temporary Chiller Installation

client icon

TOTAL KW

1.1Mw Cooling

Chilled water hosing and ancillary equipment hire

Industrial Chiller Hire in Kent- The Challenge

To supply industrial chiller hire in Kent consisting of a 1.1mw temporary chiller system acting as a contingency backup to the clients ammonia systems.

Fitted to a central district cooling system, the clients cooling system required a back-up to serve various office and industrial processes.  The total specified cooling capacity was 1100kw’s.

Dual separate chillers and pump sets required a change over system in the event of any one failing.

Industrial Chiller

The Solution to Industrial Chiller Hire in Kent

ACR recommended two 550kw air cooled Trane chillers each fed with a 4″ rubber suction/discharge hose.

Connection from the pump outlets were in 6″ composite hose to a 6″ manifold with isolation valves to each branch. In this way, switching between the pumps was possible depending on which was running.

A common return manifold was supplied and fitted.

Of particular concern was the system running pressure of 5.5barg. With no heat exchanger fitted, any potential failure of the temporary hosing would result in flood back from the very large system. To mitigate this risk, all Camloc connections were specified in Stainless Steel with new hoses specifically assembled for the rating by our friends at Merseyflex

Electrical connection was made locally using H07 RNF flexible cable supplied and fitted by ACR.

The temporary pipework was manually filled and pressure tested before opening to the clients system. Proving integrity before full operation.

Once all pre-commissioning tests were completed the system was started and the chillers load tested at 100% operation.

Finally, running logs and Fgas leak testing were completed before handing over to the client for day to day operation as required.

Summary of Contingency Chiller Hire

A really nice job this one for an appreciative client. The system was stationed as a contingency back-up for 12 weeks at the height of summer, giving the client peace of mind in the event of failure.

In the long run, contingency chiller hire can be very cost effective solution as apposed to an emergency response situation with associated down time.

If you think that your systems may be vulnerable please drop us a line. We can assist with contingency planning. Contact Here

700kw industrial Chiller Hire

Get your FREE estimate

24Hr Help. Now free from mobiles.

When calling please have the following ready:

  • Your Name
  • Company Name (If applicable)
  • Site Post Code
  • Problem you’re having
  • Email Address

    RELATED INDUSTRY SUCCESS STORIES

    Injection Moulding Cooling Hire at Polypipe

    Injection Moulding Cooling Hire at Polypipe

    To provide plastic injection moulding cooling hire for Polypipe. As one of our oldest customers, Polypipe turned to us for a solution to a critical situation.

    1000kW Process Chiller Hire

    1000kW Process Chiller Hire

    1000kw process chiller hire to assist with a plastic injection moulding process. The client was experiencing increasing production difficulties in the hot summer months due to on site chiller failures. Chilled water performs the important role of cooling the extrusion after the injection moulding process.

    Chemical Reactor Process Cooling Chiller Hire

    Chemical Reactor Process Cooling Chiller Hire

    Chemical reactor chiller hire for a major chemical production company. Syngenta approached ACR for a solution to their cooling needs at their KIP production facility.

    Left Menu Icon
    ×