Temporary Fruit Coldstore in Kent for a Major Fruit Packer

Temporary fruit coldstore in Kent was required by a rapidly growing business. Major contractural obligations meant this client required a quick solution to increase their chilled storage capacity.

client one icon

CLIENT

A Fruit Packing Company

client two icon

INDUSTRY

Food and other Perishable Products

client three icon

SOLUTIONS

Temporary Building with Temperature Control

client icon

TOTAL KW

300kw- Two Degree Holding Temperature

Temporary building fruit cold store in kent
The completed building with three of the five glycol coolers in position. High level fitting improves air transmission.

Temporary Fruit Coldstore in Kent- The Challenge

This temporary fruit coldstore in Kent project was a slow burner from the start.

 

Over an extended period, the client had been looking at a multitude of options to extend their cold storage capacity. Throughout, we worked closely with the client to look at the various options and moved quickly to build when a decision was made.

 

The final decision landed on, was to build a temporary structure on a car park area connected to the factory. Measuring 872m2, the additional space was to be used for the storage of soft fruits and required a holding temperature of 2 degrees. As with all raw food storage areas, a high quality safe finish was required.

Temporary fruit cold store in kent
The partially completed building with the main supports and roof in position. Next, the insulated walls will be fitted.

The Solution to temporary Fruit Coldstore in kent

For the structure, we recommended an aluminium framed building with an inflatable roof and 100mm PIR wall panels for increased efficiency. These buildings are held in stock and can be delivery and erected quickly.

 

Although not completely flat, the car park was deemed as suitable without the use our Heavy Deck levelling system, saving both time and costs.

 

We recommended a 320kw glycol cooling system. Featuring five ACR LT50 low temperature AHU’s and four chillers, the system was designed with redundancy in mind- meaning that no single failure would compromise the stores operation.

 

Throughout, a high quality finish was specified and supplied, including, a lovely resin floor which really set the final quality of this temporary fruit coldstore in Kent.

Summary

Overall, the client and the ACR team were really happy with the end product here. Not only was this temporary fruit coldstore in Kent delivered on time, it was also constructed to the very high finish required by the clients customers.

 

Indeed, the building is now in everyday use providing the critical storage space that the client required. Contracted for a 24 month hire period, options to extend are offered if required. A truly flexible service that has boosted this customers business.

 

If you require additional storage space please get in touch and we will be happy to talk you through the many options available.

Temporary fruit coldstore in Kent-
The completed temporary building. Overall, a high standard of finish was achieved here

Get your FREE estimate

24Hr Help. Now free from mobiles.

When calling please have the following ready:

  • Your Name
  • Company Name (If applicable)
  • Site Post Code
  • Problem you’re having
  • Email Address

    A Short Walk Around of the Completed Building

    RELATED INDUSTRY SUCCESS STORIES

    A Temporary Chilled Building for Logistics Operations

    A Temporary Chilled Building for Logistics Operations

    A great job this one. We were approached to offer a rapid solution for a chilled packing area. Large in size, and to be built within an existing warehouse, the area was to be used for chilled storage and packing of box meals.

    A Temporary Chilled Logistics Building for Food Distribution

    A Temporary Chilled Logistics Building for Food Distribution

    To provide a major distribution company with a temporary chilled logistics building. A really good job this one, with an interesting problem to solve.

    Additional Cold Storage Capacity for a Major Flower Distributor

    Additional Cold Storage Capacity for a Major Flower Distributor

    Cold storage is especially tricky to maintain in readiness for the six or seven weeks of the year when you really need it. Renting equipment when you really need it makes business sense.

    Temporary Cold Storage in Scotland. The Scalloway fish market in Shetland

    Temporary Cold Storage in Scotland. The Scalloway fish market in Shetland

    ACR were very proud to have been chosen to carry out this strategic project for Shetland Island Council. This project was a slow burner from the-off, with multiple visits to the Island, many options were discussed until the final solution was arrived at.

    Turning a Warehouse into a Temporary Coldstore

    Turning a Warehouse into a Temporary Coldstore

    One of the larger warehouse cold storage conversions we have carried out. From the initial proposal to final commissioning and ongoing support, this project ticked all the boxes for us and a very happy client.