Here we delve into a recent project that stemmed from an urgent request from a client for a fast turnaround chiller hire solution.
A 1000kw chiller installed to provide contingency cooling in the event of a failure of the clients systems.
Here we delve into a recent project that stemmed from an urgent request from a client for a fast turnaround chiller hire solution.
We were contacted by B&S Group (a client we have worked with many times in the past) who were worried about the rising ambient temperatures and the effect this would have on their pharmaceutical storage warehouse.
The products contained have a maximum holding temperature of 25 degrees, which when your holding over two million pounds worth, can lead to major losses if exceeded.
A fast turnaround chiller hire solution was urgently needed.
A project to install a new warehouse cooling and heating system had been delayed due to holds ups with the supply of a heat pump unit. The delay of around four weeks left the customer exposed to abnormally high spring 2025 temperatures.
Whilst not an immediate issue, it did require addressing as warehouses, whilst they are insulated and have the thermal mass tend to stay cool, also do not cool down easily once the temperature builds over time. Hence, addressing temperature issues before they come over the top is critical.
Time was of the essence for this chiller hire project and clearly required a fast turnaround chiller hire solution.
A site survey was carried out the same day as the call and a plan put in place.
We proposed installing a temporary chiller and buffer tank which was connected with fast install EPMD pipe-work to the customers existing AHU’s.
All relatively simple for a professional rental company.
Key components of a fast turnaround chiller hire system include;
Following delivery the chiller hire system was installed in less than 4 hours. This fast turnaround is in the most part due to the modular and portable nature of the components. For instance, hosing is flexible and connected by camloc connectors which saves a lot of time.
Commissioning followed and was reasonably straight forward. The buffer tank was filled and the chiller pump started. With an open vented system the pump uses the tank for head pressure to the impeller. The pump will then push the water around the system forcing the air back to the tank (self purging). In this way, no time consuming air bleeding is required and the system does not need pressurising. In short, its more reliable and quicker to install- both major advantages for temporary chiller hire systems.
We did encounter some debris in the clients water system. This required multiple strainer cleans, but once completed, the system remained clean and reliable.
Fast turnaround chiller hire services require a deep engineering knowledge and experience in the field to deliver properly.
At Advanced Climate Rentals we firmly believe in this process and all that it means to clients. Developing mutual trusting business relationships is our number one priority.
We hold large stocks of maintained chillers which ideally places us to respond in a confident manor to any project.
Please get in touch if you have a need or would simply like our advice with any issues you may have- we are here to help.
For more information about our chiller hire service or to see case studies of projects, please visit us here.
Firstly, we would recommend that you collect as much information as possible regarding your requirements ie. The capacity of the failed chiller, any water and power connections.
Once you have some basic information drop us a line by phone or using the contact forms here. We will come straight back to you with initial thoughts. If it’s really urgent we will get someone to you the same day to get the ball rolling.
In the mean time equipment will be made ready and earmarked for your project pending the issue of an order. In this way delivery is not delayed.