To provide emergency server room cooling during un-planned repair works. Critically, the area required fast installation of a cooling system to maintain seem-less operation.
Emergency Server Room Cooling For London Data Centre
To provide emergency server room cooling during un-planned repair works. Critically, the area required fast installation of a cooling system to maintain seem-less operation.
Basingstoke Aquadrome required a ventilation system to maintain operation whilst their fixed AHU was replaced.
To provide temporary hospital ventilation hire whilst a AHU replacement programme was carried out.
To provide a major distribution company with a temporary chilled logistics building. A really good job this one, with an interesting problem to solve.
It’s safe to say this ranks among one of our most challenging projects. Albeit, not in terms of scale, but more from a controls point of view. The client’s plant was to undergo a replacement programme.
A great job this one. We were approached to offer a rapid solution for a chilled packing area. Large in size, and to be built within an existing warehouse, the area was to be used for chilled storage and packing of box meals.
A really nice temporary chilled storage project. This fruit storage warehouse was finished to a high specification and has been contracted initially for 2 years.
This was one of those jobs that landed very quickly from a client with a number of requirements. As well as experiencing very high temperatures in the production area,
To supply industrial chiller hire in Kent consisting of a 1.1mw temporary chiller system acting as a contingency backup to the clients ammonia systems.