Advanced Climate Rentals were approached at short notice by the client with a significant problem. The plane was due to be used for an event, this included decking out the fuselage with live foliage to give a woodland theme.
This HVAC project came about as a result of the test events held prior to the Olympics. Worryingly, it was found that insufficient space was available for the opening ceremony performers to make up in.
Chemical reactor chiller hire for a major chemical production company. Syngenta approached ACR for a solution to their cooling needs at their KIP production facility.
Temporary cooling for chocolate storage. Without doubt one of the most challenging projects we have ever completed. This emergency cooling installation presented challenges in terms of equipment positioning and safe working practices.
Event air-conditioning hire in London for an Olympic project that was specified and delivered at short notice for the games.
Event air-conditioning hire in London for an Olympic project that was specified and delivered at short notice for the games.
ACR Ltd were called by the engineering team at the Marriott Hotel in Durham with a significant problem- their fixed York chiller had broken down and they needed a replacement.
ACR were contracted by Nussli Switzerland to supply a complete HVAC overlay system for temporary basketball courts. This major Olympic project was due to be located on the Lee Valley behind the Ice Centre.
ACR was contracted to supply temporary data centre cooling rental whilst a major CCU replacement programme was carried-out.
1000kw process chiller hire to assist with a plastic injection moulding process. The client was experiencing increasing production difficulties in the hot summer months due to on site chiller failures. Chilled water performs the important role of cooling the extrusion after the injection moulding process.