Temporary Boiler Hire

300kw temporary boiler hire. A fully packaged 300kw condensing boiler in containerised temporary plantroom. For all planned/ emergency heating and hot water applications. 240v 13A supply!

300kw Temporary Boiler Hire

Product Name

24HR HELP FREE ESTIMATE

In Stock | Unbeatable service and reliability

  • Site Delivery
  • Site Installation
  • Extended Period Hire
  • FREE Site Survey
Request A Call Back
Get FREE estimate
Heating duty (Const Variable) 50- 300kw
Fuel type Natural  Gas
Power requirements 240V 13A
Temperature flow/ return 50/30 Deg
Fuel consumption 15.1 m3/hr
AHU Weight 1200kg
AHU- width 3000mm
Depth 1020mm
Height 2100mm

Trane IH65 Heat Pump AHU Rental

A fully packaged 300kw condensing temporary boiler.

This temporary plantroom consists of two cascade 150kw condensing boilers on a mechanically separated primary circuit, with secondary pumps in a neat enclosure with safe lifting points- making it a very versatile unit for all rental applications.

Included within 300kw temporary boiler hire package;

  • Twin cascade ACV EVO S 150kw condensing boilers.
  • Primary and secondary variable speed circulation pumps
  • All controls for safe efficient operation, including hot water and wireless space temperature monitoring.
  • 300kw brazed heat exchanger
  • LOLA certificated lifting frames with fork pockets

This 300kw boiler hire service can be supplied with all ancillary equipment for fast turnkey installations.

Call us now for help and support 24/7

Key features of this 300kw temporary boiler hire plantroom.

  • A fully packaged plantroom unit including all functions for stand alone operation.
  • Natural gas fuel
  • 240v 13A single phase electrical supply
  • 300kw 5:1 turndown
  • NOx class6
  • Digital controls for safety/ user integration and cascade operation.
  • Wireless building temperature monitoring and control.
  • A very compact design with small footprint.
  • LOLA certificated lifting frames for safe lifting.
  • Space; a clear flat open space of around 4x 2mt
  • This 300kw temporary boiler requires a single phase 13A plug
  • A suitable natural gas supply.
  • Good access routes for delivery by HIAB lorry.
  • Mounted in lifting frames. Can be handled on-site with a suitable fork lift or tele-handler truck.

Case Study

Related Products

Left Menu Icon