Temporary ventilation hire in London for Fit-Out UK. Critical cooling and ventilation of a production area.

Temporary Ventilation Hire In London- The Challenge

This was one of those jobs that landed very quickly from a client with a number of requirements.

As well as experiencing very high temperatures in the production area, Covid 19 infection control was required to continue operations safely. A speedy response was required to address the issues.

Inner-Case-Study-img-1
The completed installation. 500mm ducting was used to supply the air to the clients existing system.

Lifting the unit into position. Scaffolding limited headroom and needed to be carefully worked around.

The Solution To Temporary Ventilation Hire In London

With the aforementioned in mind, a site survey was booked on the same day and a proposal for temporary ventilation hire in London put forward.

A Trane IH85 heat pump AHU was recommended for the task. Key features of this unit include, cooling/ heating, ventilation, and helpfully for infection control, C02 monitoring with adjustment of fresh air volumes. All in all, a great one box solution for this project and one the client was ultimately happy to order.

The unit was brought to site on a hiab lorry the next working day and lifted into position. A tricky operation due to scaffolding that was in place for other works.

Once in position, the unit was wired into a 125A electrical outlet and 500mm flexible air ducts fitted for air connection to the work area. A remote temperature controller was installed to the work area.

To ensure correct operation, full commissioning of the system was carried out by our engineers. Highly experienced, they can check that the plant is in good running order and make adjustments that ensure the best operation.

View our AHU info pages here

Chiller Units
The completed installation. 500mm ducting was used to supply the air to the clients existing system.

Summary

This temporary ventilation hire in London project was in operation for a total of 12 weeks.

Providing faultless operation, it ensured that our customers operatives were able to work in a cool fresh environment, significantly increasing productivity.

One of the key advantages here, was having the right equipment in stock and available for fast install by our experienced engineers. We are proud of the service we offer our clients and would be happy to assist in any way.