Case
Studies

AN URGENTLY REQUIRED TEMPORARY COLDSTORE SOLUTION FOR VEGETABLES

case-study-icon-1

Client

Vegetable Grower and Packer

case-study-icon-2

Industry

Farming

case-study-icon-3

Solutions

Temporary Insulated Building With Temperature Control

case-study-icon-4

Total KW

140kw Cooling/ 220KVA Generation

An Urgently Supplied Temporary Vegetable Coldstore Solution for Seasonal Peak Production.

This flexible stand-alone building with generator and cooling system was the ideal solution for a quick additional space.

The Customers Challenge for Urgently Required Additional Cold Storage Space.

We really love getting stuck-in to jobs like this. Not only does the customer have an immediate need, they are also looking for a fast effective solution to the problem.

Vegetable growers, particularly around the Christmas period, require a massive scale up in operations to meet the contractural demands placed on them.

The shear volume of produce that requires harvesting and sending to market requires very careful planning.

If available, cold storage space can play the important role of buffering between the two ends of the business. If not, massive stresses can be heaped on the operational capacity.

These situations reveal the inherent strengths in our products and services.

The completed colstore installation showing the front of the building and the generator used for power.

Temporary Vegetable Coldstore Solution

Essentially, because of the urgent situation that the client found themselves in, we suggested a proven package that included a fast install temporary building and cooling system.

We say proven, because this package has been used successfully in the past and stock is generally available. It’s really a no brainer to get things moving fast, especially when the package is stand alone with power generation- essentially, its all down to you to deliver.

So we supplied to the customer the following;

  • A 15x30x 2.5 single skinned temporary building with lighting pack.
  • A 140 kw low temperature cooling system, including 2x 50kw low temp AHU’s with a 140kw glycol chiller.
  • A 220Kva generator with power distribution.

Once the plan had been agreed with the client, this job turned into an exercise in mobilisation of equipment and services as rapidly as possible.

Happily, all went smoothly and the client was up and running within three days first attending site to install this temporary vegetable coldstore solution.

 

Here we can see the generator with the chiller positioned behind. Also, the power distribution. These modular systems are quick and easy to install.

Proven Project Outcome for this Temporary Coldstore Solution

Due to our experience, this was a relatively simple project project to one, recommend to the client, and two, deliver.

You cant beat experience, and having all the equipment available really means that you can make a resounding success of projects such as this.

Clients really appreciate the straightforward delivery and the improvement in their operations.

This project stayed in position for a total of three weeks providing consistent 4 degree operation.

All in all, we are very happy with the results achieved here and have a very happy client to boot.

To find out more about our temporary buildings please click here