A Temporary Chilled Building For Logistics Operations- How This Packing Area Was Delivered In Under Three Weeks

To construct a temporary chilled building for a food packaging operation.

Temporary Chilled Building- The Challenge

A great job this one. We were approached to offer a rapid solution for a chilled packing area. Large in size, and to be built within an existing warehouse, the area was to be used for chilled storage and packing of box meals.

A very tight schedule of 3 weeks to completion was required to meet a contract start date. With this in mind, a rapidly built structure and cooling system was required. The proposed contract duration was 35 weeks with costed options for extension.

A temporary building under construction. The aluminium frames are assembled on the ground before being lifted into position.

The Solution To A Temporary Chilled Building

After initial meetings and discussions, an insulated 25x100mt structure was proposed with a 600kw glycol cooling system. A modular Aluminium framed structure was fitted.

Supplied flat packed, the building was assembled on-site. Superior insulation was achieved with 80mm PIR wall panels and inflatable membrane roof. For rapid installation, a modular cooling system was fitted with 3 external glycol chillers and 10 internal 50kw low temperature AHU’s. A rubber hosing system with Camloc connectors was used for glycol distribution.

In the photo, construction of the building can be seen. The Aluminium support beams are assembled on site and lifted/ fixed into position. Following-up behind, the wall and roof panels are then installed. Built in 5mt bays, the building can be extended to any size.

The completed temporary chilled building. In the background the low temperature AHU’s can be seen.

Fitted their own lifting frames, the AHU’s are designed to be portable. Significantly, for rapid install, they include a controller and glycol cooling valve.

Internal shot of the completed building. The low temperature AHU’s can be seen to the side. Ten were fitted in total to maintain a 4 degree holding temperature.

The external glycol chillers. In the foreground the 400kw chiller and to the rear the 2x 150kw chillers. Modular rubber hosing was used for distribution.

The external glycol chillers. In the foreground the 400kw chiller and to the rear the 2x 150kw chillers. Modular rubber hosing was used for distribution.

The external plant- 2x 150kw and 1x 400kw glycol chillers.

To ensure reliable operation of the chilled building three separate cooling systems were installed. In this way, the failure of any one system would not compromise operation. Modular rubber hosing can be seen running away from the units.

5 Key Advantages Of Hiring A Temporary Chilled Building;

  1. Rapid installation from stock.
  2. Fixed weekly payments that are fully offset able against gross profit
  3. No capital outlay or depreciation costs on capital equipment.
  4. All servicing and breakdown costs are met by the rental company.
  5. Flexibility, modifications to the structure and cooling system can be made easily.

For further information on our temporary building cold storage services please click here

Summary

We really love jobs like this.

From initial customer contact to hand over, delivery was achieved in under 5 weeks. All the customers requirements were met and they were able to start operations on-time. It really shows what can be achieved when a motivated customer meets a “can do” contractor.

The project to date has been in operation for 3 months. Modifications have been made internally to the building, with areas partitioned to suite ongoing needs. Another key advantage to this temporary solution.

Products Used In This Case Study

50kw Low Temperature AHU Hire
50kw Low Temperature AHU Hire

Our 50 KW Air Handling Units (AHUs) are the ideal solution for any commercial or industrial cooling applications. They can be hired, installed and working onsite with as little as 24 hours’ notice.

View Product
400kw Chiller Hire
400kw Chiller Hire

400kw chiller hire made easy…..

View Product
Temporary Buildings For Cold Storage
Temporary Buildings For Cold Storage

Temporary Buildings for Cold Storage- Modular and rapidly built they are an ideal option for rapid expansion of cold storage space.

View Product
150kw Chiller Unit Hire (Packaged)
150kw Chiller Unit Hire (Packaged)

Our 150KW commercial and industrial chillers are available for immediate hire.

View Product
Chilled Water Hose Hire
Chilled Water Hose Hire

Temporary chilled water hose and ancillaries rental from Advanced Climate Rentals.

View Product

How We've Helped Others In Your Sector

Temporary Fruit Coldstore in Kent For a Major Packer
Temporary Fruit Coldstore in Kent For a Major Packer

A really nice temporary chilled storage project. This fruit storage warehouse was finished to a high specification and has been contracted initially for 2 years.

View Industry
A Temporary Chilled Logistics Building for Food Distribution
A Temporary Chilled Logistics Building for Food Distribution

To provide a major distribution company with a temporary chilled logistics building. A really good job this one, with an interesting problem to solve.

View Industry
Temporary Warehouse For Imported Fruit
Temporary Warehouse For Imported Fruit

A fully temperature controlled temporary structure supplied to a port for banana storage.

View Industry
Additional Cold Storage Capacity for a Major Flower Distributor
Additional Cold Storage Capacity for a Major Flower Distributor

Cold storage is especially tricky to maintain in readiness for the six or seven weeks of the year when you really need it. Renting equipment when you really need it makes business sense.

View Industry
Temporary Cold Storage in Scotland. The Scalloway fish market in Shetland
Temporary Cold Storage in Scotland. The Scalloway fish market in Shetland

ACR were very proud to have been chosen to carry out this strategic project for Shetland Island Council. This project was a slow burner from the-off, with multiple visits to the Island, many options were discussed until the final solution was arrived at.

View Industry
Turning a Warehouse into a Temporary Coldstore
Turning a Warehouse into a Temporary Coldstore

One of the larger warehouse cold storage conversions we have carried out. From the initial proposal to final commissioning and ongoing support, this project ticked all the boxes for us and a very happy client.

View Industry
Temporary vegetable coldstore solution
Temporary vegetable coldstore solution

A rapidly supplied Temporary building coldstore for vegetables

View Industry
24/7
24/7 CALL-OUT 07976 329294
EMAIL US [email protected]