We designed a full Nplus1 replacement system with power generation for this project.
Focussing the design for 100% (Nplus1) redundancy was important to ensure that the client was comfortable with this temporary computer suite cooling project going ahead.
Due to the sensitivity and space restrictions in the work area a decision was made early to locate all the mechanical services externally. Major advantages included, freeing up internal work space and excluding water from the room.
Two overlapping stand alone systems were installed, each consisting of an ACR 160.120 AHU with a 150kw chiller for cooling. Both were specified to maintain the full cooling load- in this way, if any one system was to fail, full operation would be maintained by the other (nplus1 operation).
Envisaging an element of free cooling due to the season, a full fresh air supply was utilised (no recirculated) with the chillers supplying additional cooling as required. The supply air temperature was maintained at 16 degrees.
Supply air was delivered to the computer suite with 500mm flexible ducts which were moved as required by the engineers.