    A Temporary Chilled Building for Logistics Operations- How This Packing Area Was Delivered in Under Three Weeks

     

    The Challenge;

     

    To construct a temporary chilled building for a food packaging operation.

    A great job this one. We were approached to offer a rapid solution for a chilled packing area. Large in size, and to be built within an existing warehouse, the area was to be used for chilled storage and packing of box meals.

    A very tight schedule of 3 weeks to completion was required to meet a contract start date. With this in mind, a rapidly built structure and cooling system was required.

    The proposed contract duration was 35 weeks with costed options for extension.

     

    The Solution;

     

    After initial meetings and discussions, an insulated 25x100mt structure was proposed with a 600kw glycol cooling system.

    A modular Aluminium framed structure was fitted. Supplied flat packed, the building was assembled on-site. Superior insulation was achieved with 60mm PIR wall panels and inflatable membrane roof.

    For rapid installation, a modular cooling system was fitted with 3 external glycol chillers and 10 internal 50kw low temperature AHU’s. A rubber hosing system with Camloc connectors was used for glycol distribution.

    Below, construction of the building can be seen. The Aluminium support beams are assembled on site and lifted/ fixed into position. Following-up behind, the wall and roof panels are then installed.  Built in 5mt bays, the building can be extended to any size.

    a Temporary building being constructed

     

    The completed temporary chilled building. In the background the low temperature AHU’s can be seen. Fitted their own lifting frames, the AHU’s are designed to be portable. Significantly, for rapid install,  they include a controller and glycol cooling valve.

    temporary chilled building

     

    The external plant- 2x 150kw and 1x 400kw glycol chillers. To ensure reliable operation of the chilled building three separate cooling systems were installed. In this way, the failure of any one system would not compromise operation. Modular rubber hosing can be seen running away from the units.

    Temporary chilled building

     

    Summary;

    We really love jobs like this. From initial customer contact to hand over, delivery was achieved in under 5 weeks. All the customers requirements were met and they were able to start operations on-time. It really shows what can be achieved when a motivated customer meets a “can do” contractor.

    The project to date has been in operation for 3 months. Modifications have been made internally to the building,  with areas partitioned to suite ongoing needs. Another key advantage to this temporary solution.

     

    The Clients Thoughts on Our Service

    “In the summer of 2020 when the world was dealing with significant pandemic challenges Oakland International was requested to support a National Food operator to deliver vital supplies direct to homes.

    The timescales were extremely challenging in terms of the notice period to get the operations deployed.

    Part of the requirement was to set up a chilled capability within a 30,000 sqft space.

    Advanced Climate Rentals was chosen for the contract and Roger Earle and the team stepped up to the challenge delivering on time and with a significant amount of hard work and co-operation on site at Bardon.

    All the requirements where met in full enabling Oakland International to execute the client’s requirements on time and in budget.

    We enjoyed working with the Advance cooling team and we would not hesitate in collaborating in the future should the requirement be once again placed at our Door”

    Shaun Foley

    Group Managing Director

     

    5 key advantages of hiring a temporary chilled building;

    1. Rapid installation from stock.
    2. Fixed weekly payments that are fully offset able against gross profit
    3. No capital outlay or depreciation costs on capital equipment.
    4. All servicing and breakdown costs are met by the rental company.
    5. Flexibility, modifications to the structure and cooling system can be made easily.

     

    For further information on our temporary building cold storage services please click here

    Need help and Advice With Your Project?

    Contact Us
    x

      What is 7 x 3 ?

      SIMILAR CASE STUDIES

      Right Menu Icon