Gallery
- Chiller install. This Carrier 30XA was installed in Victoria St, London
- Air handling unit hire. The ACS 160.120 climate control AHU- rated at 160kw cooling and 120kw heating (electric on-board)
- Decanting refrigerant from a chiller. This climaveneta machine was short of refrigerant and required pressure testing
- Temporary chiller, pump and chilled water system hire
- Large scale temporary space cooling and heating. Suitable for all applications, including, marquees/ temporary structures and buildings- commercial and industrial
- Large scale HVAC overlay systems. These climate control units were installed at the Lee Valley Olympic Basketball project.
- Chiller servicing. Logging, leak testing and Fgas compliance systems
- Temporary HVAC systems. An ACS 160.120 climate control AHU and 110kw chiller installed at the Olympic Fleet Depot.
- Chiller Maintenance- Advanced Cooling Maintains some of the largest cooling plants in London- the City Point centrifugal chillers
- Chiller repair. Specialist engineering for chillers. All makes and types. A Carrier 06NA compressor was replaced here
- Stage cooling- sound stage 9 Elstree
- Commissioning a completed chilled water system at the Lee Valley Olympic Basketball Courts
- Programmed project works. Six water chiller evaporators were replaced on on rolling programme at this data centre.
- Inside a 750kw Turbocor Chiller. Advanced Cooling is one of the first companies to bring this technology to the rental market.
- Process cooling chiller installation. A modular chiller being installed at a plastic extrusion plant.
- Fabric air sock distribution system installed at the Olympic Excel fleet depot. Air sock is quickly installed and distributes air evenly over large areas.
- The Lee Valley temporary Olympic basketball courts under construction. The roofs structures are assembled on the ground and lifted into position.
- Air handling unit being positioned.
- The 700kw Carrier 30GX chiller and pump station. The modular hosing system was installed in one day.
- Installing a temporary chilled water pipe-work system. This system used rubber and composite hosing. All fittings were Stainless Steel
- The completed installation serving the mixed use area of the Olympic basketball courts
- Large scale fabric air sock distribution. The Eton Manor Olympic Practice Pools. 1200mm diameter duct was used here. ACS has large stocks available for hire
- Chiller servicing in The City of London. Carrier XA water chillers
- Inside one of the completed Olympic basketball courts. One of the 800mm distribution air socks can be seen in the roof superstructure
- A pump station under construction in the factory. The unit features a 23kw twin head pump, pressurisation unit and full controls